Details
When was it constructed and how long has it been in service:
This new diversion structure was installed in 2017 as part of a larger project that extended over 3 miles to the Upper Brays WWTP. A guided weir channel was added during construction to allow the 108” to be isolated from the incoming 72” and 78” lines for future inspection, maintenance and cleaning.
Dimensions:
14' x 12' x 53'9" CAST-IN-PLACE BOX STRUCTURE
Depth of structure:
Diversion box was a finished ID of 53'9"
Health and safety:
Used conventional confined space entry program and trench shoring.
Has any re-inspection been performed? What was the condition of the structure?
Yes, the structure was in perfect condition.